Academia.edu no longer supports Internet Explorer.
To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to upgrade your browser .
- We're Hiring!
- Help Center
Construction Management
- Most Cited Papers
- Most Downloaded Papers
- Newest Papers
- Last »
- Construction Project Management Follow Following
- Project Management Follow Following
- Construction Economics Follow Following
- Construction Engineering and Management Follow Following
- Construction Technology Follow Following
- Civil Engineering Follow Following
- Lean Construction Follow Following
- Quantity Surveying Follow Following
- Construction Law Follow Following
- Project Risk Management Follow Following
Enter the email address you signed up with and we'll email you a reset link.
- Academia.edu Journals
- We're Hiring!
- Help Center
- Find new research papers in:
- Health Sciences
- Earth Sciences
- Cognitive Science
- Mathematics
- Computer Science
- Academia ©2024
construction management Recently Published Documents
Total documents.
- Latest Documents
- Most Cited Documents
- Contributed Authors
- Related Sources
- Related Keywords
Research on collaborative construction management of construction project based on BIM technology
Implementing virtual reality - building information modeling in the construction management curriculum.
As the industry transitions towards incorporating BIM in construction projects, adequately qualified students and specialists are essential to this transition. It became apparent that construction management programs required integrating Building Information Modeling (BIM) into the curriculum. By bringing Virtual Reality (VR) technology to BIM, VR-BIM would transform the architectural, engineering, and construction (AEC) industry, and three-dimensional (3D) immersive learning can be a valuable platform to enhance students' ability to recognize a variety of building principles. The study carries out a methodology for implementing the VR-BIM in the construction management undergraduate program. Based on the previous literature review, in-depth analysis of the program, and accreditation requirements, VR-BIM will be implemented throughout the curriculum by combining stand-alone class and integration in the existing courses method. The challenges that may face the program planning to implement VR-BIM are discussed, and few solutions are proposed. The lab classroom layout appropriate for the applications is designed to be adjusted for several layouts to accommodate all learning styles and objectives. A comparison between different Head-Mounted Display (HMD) headsets is carried out to choose the appropriate equipment for the lab.
Evaporated Responsibility: The Collapse of the West Gate Bridge in Melbourne on 15 October 1970
AbstractOn 15 October 1970, at 11:50AM, part of the West Gate Bridge in Melbourne, span 10-11 of 367 feet length, disintegrated and triggered the collapse of the bridge. Thirty-five men were killed in the disaster. The bridge was still under construction, all those killed were workers or engineers employed on the construction site. The investigation of a Royal Commission revealed a mismatch between an ambitious structural design of the bridge plus an unconventional method of erection and a fragmented, conflict-ridden construction management whose detrimental effects remained unchecked by public authorities. Regulatory powers and enforcement competence had been delegated to a QUANGO—a quasi-non-governmental organization—which diluted responsibility structures and decisively weakened the coordination and control capacity of the agency.
Based on BIM Computer-Aided Construction Management Research
Expected competencies of construction management graduates working in china.
Construction manager competencies in today's construction industry are the key factors of project success. Compared to traditional roles, they are faced with a situation showing a gradual shift in their roles and functions especially projects nowadays are encountering more and more complicated issues during construction phase and the increasing complexity of projects poses huge demand for construction managers possessing competencies capable to adapt to this changing industry environment by their knowledge and skills gained through training especially during their early years of construction management education received in polytechnics or universities. Such kind of training builds the foundations for construction managers enabling to develop further a way to adapt to the escalating expectations of the clients and more important related to the development of leadership, management and problem-solving skills construction organisations are looking for. This paper aim to evaluate the expected competencies of construction management graduates in China focusing on the development of construction manager during their early training and how the education institutes can make sure their curriculums capable to prepare learners for the changing needs of construction industry in China. The result of this study is to provide a theoretical basis for the excellent construction management curriculum design, thus encouraging education institutes to adopt industry-oriented approach to deal with ever-changing construction industry.
Lean construction management techniques and BIM technology – systematic literature review
Construction management of overhead transmission lines, key points of municipal engineering construction management and perfection of management system, the application of “deep learning” in construction site management: scientometric, thematic and critical analysis.
Purpose The digital construction transformation requires using emerging digital technology such as deep learning to automate implementing tasks. Therefore, this paper aims to evaluate the current state of using deep learning in the construction management tasks to enable researchers to determine the capabilities of current solutions, as well as finding research gaps to carry out more research to bridge revealed knowledge and practice gaps. Design/methodology/approach The scientometric analysis is conducted for 181 articles to assess the density of publications in different topics of deep learning-based construction management applications. After that, a thematic and gap analysis are conducted to analyze contributions and limitations of key published articles in each area of application. Findings The scientometric analysis indicates that there are four main applications of deep learning in construction management, namely, automating progress monitoring, automating safety warning for workers, managing construction equipment, integrating Internet of things with deep learning to automatically collect data from the site. The thematic and gap analysis refers to many successful cases of using deep learning in automating site management tasks; however, more validations are recommended to test developed solutions, as well as additional research is required to consider practitioners and workers perspectives to implement existing applications in their daily tasks. Practical implications This paper enables researchers to directly find the research gaps in the existing solutions and develop more workable applications to bridge revealed gaps. Accordingly, this will be reflected on speeding the digital construction transformation, which is a strategy over the world. Originality/value To the best of the authors’ knowledge, this paper is the first of its kind to adopt a structured technique to assess deep learning-based construction site management applications to enable researcher/practitioners to either adopting these applications in their projects or conducting further research to extend existing solutions and bridging revealed knowledge gaps.
Construction Management Analysis of Electromechanical Installation Project
Export citation format, share document.
Critical Review of Studies on Complex Construction Systems
- Conference paper
- First Online: 28 November 2024
- pp 1541–1550
- Cite this conference paper
- Lifeng Zhu 23 ,
- Yan Ning 23 &
- Xiaoqi Xu 23
Part of the book series: Lecture Notes in Operations Research ((LNOR))
Included in the following conference series:
- International Symposium on Advancement of Construction Management and Real Estate
205 Accesses
With the frequent occurrence of complexity challenges in implementing project-based activities and processes, more and more studies have been devoted to these issues by adopting a perspective of complex systems theory, as evidenced by the growth of related papers published in the past three decades. Complex construction systems (CCS) management has gradually become an emerging topic of concern in the field of construction project management. This study aims to investigate the current quo and trends of CCS research through a structured literature review. Twenty-four relevant articles published from 1990 to 2022 in three journals, the Project Management Journal , International Journal of Project Management , and IEEE Transactions on Engineering Management , were identified and analyzed in terms of the number of articles published annually, country/regional contributions, and research institutions. The analysis results indicate that CCS in the sector of infrastructure and construction has become an important case for research on complex project systems. In terms of country/region contribution, the United States, the United Kingdom, Australia, and China have enjoyed relatively more advantages in CCS research due to involving more publications. Four subtopics are then identified: system analysis and decision-making, system organization and planning, system development and design, and system information management. Regarding research design, CCS research favored the qualitative research design and used real large complex projects as a research base. Finally, conclusions and suggestions for CCS development in the future are provided.
This is a preview of subscription content, log in via an institution to check access.
Access this chapter
Subscribe and save.
- Get 10 units per month
- Download Article/Chapter or eBook
- 1 Unit = 1 Article or 1 Chapter
- Cancel anytime
- Available as PDF
- Read on any device
- Instant download
- Own it forever
- Available as EPUB and PDF
- Durable hardcover edition
- Dispatched in 3 to 5 business days
- Free shipping worldwide - see info
Tax calculation will be finalised at checkout
Purchases are for personal use only
Institutional subscriptions
Similar content being viewed by others
Issues and Challenges Contributing to Complexity in Infrastructure Project Performance
System dynamics analytical modeling approach for construction project management research: A critical review and future directions
Conceptualizing Hard and Soft Benefits of Adopting BIM in Construction Projects: A Systematic Review
Brady, T., & Davies, A. (2014). Managing structural and dynamic complexity: A tale of two projects. Project Management Journal, 45 (4), 21–38.
Article Google Scholar
Braglia, M., & Frosolini, M. (2014). An integrated approach to implement project management information systems within the extended enterprise. International Journal of Project Management, 32 (1), 18–29.
Browning, T. R. (2001). Applying the design structure matrix to system decomposition and integration problems: A review and new directions. IEEE Transactions on Engineering management, 48 (3), 292–306.
Chen, O. (2009). Can the pilot bot project provide a template for future projects? a case study of the chengdu no. 6 water plant b project. International Journal of Project Management, 27 (6), 573–583.
Google Scholar
Cherian, E. J. (1963). The task group—A group approach to problem solving. IEEE Transactions on Engineering Management, 2 , 87–89.
Daniel, E., & Daniel, P. A. (2019). Megaprojects as complex adaptive systems: The Hinkley point C case. International Journal of Project Management, 37 (8), 1017–1033.
Davies, A., & Mackenzie, I. (2014). Project complexity and systems integration: Constructing the london 2012 Olympics and Paralympics games. International Journal of Project Management., 32 (5), 773–790.
Doo, D. K. (1993). Framework for results: Implementing a power-station information-management system across a multilocation environment. International Journal of Project Management, 11 (3), 175–184.
Garces, E., Daim, T. U., & Dabić, M. (2021). Evaluating R&D projects in regulated utilities: The case of power transmission utilities. IEEE Transactions on Engineering Management, 40 (2), 533–553.
Geraldi, J., Maylor, H., & Williams, T. (2011). Now, let's make it really complex (complicated) A systematic review of the complexities of projects. International Journal of Operations & Production Management, 31 (9), 966–990.
Holland, J. (2014). Complexity . Oxford University Press.
Huang, Y. L., & Pi, C. C. (2010). Competition, dedicated assets, and technological obsolescence in multistage infrastructure investments: A sequential compound option valuation. IEEE Transactions on Engineering Management, 58 (1), 141–153.
Karniel, A., & Reich, Y. (2009). From DSM-based planning to design process simulation: A review of process scheme logic verification issues. IEEE Transactions on Engineering Management, 56 (4), 636–649.
Levinthal, D. A., & Warglien, M. (1999). Landscape design: Designing for local action in complex worlds. Organization Science, 10 (3), 342–357.
Li, C., Ding, L., & Fang, Q. (2022). Dynamic simulation of the probable propagation of a disaster in an engineering system using a scenario-based hybrid network model. IEEE Transactions on Engineering Management . https://doi.org/10.1109/TEM.2022.3157528
Li, Y., Lu, Y., Kwak, Y. H., & Dong, S. (2015). Developing a city-level multi-project management information system for Chinese urbanization. International Journal of Project Management, 33 (3), 510–527.
Li, Y., Lu, Y., Ma, L., & Kwak, Y. H. (2018). Evolutionary governance for mega-event projects (MEPs): A case study of the World Expo 2010 in China. Project Management Journal, 49 (1), 57–78.
Luo, L., He, Q., Jaselskis, E. J., & Xie, J. (2017). Construction project complexity: Research trends and implications. Journal of Construction Engineering and Management, 143 (7), 04017019.
Mahalingam, A. (2022). How institutional intermediaries handle institutional complexity in vanguard megaproject settings. International Journal of Project Management, 40 (4), 320–331.
Maier-Speredelozzi, V., & Still, B. (2021). Robust project-based organizations for the design of complex engineered systems. Project Management Journal, 52 (4), 367–378.
Malchow, H. L., & Croopnick, S. R. (1985). A methodology for organizing performance requirements for complex dynamical systems. IEEE Transactions on Engineering Management, 1 , 10–15.
Mesa, H. A., Molenaar, K. R., & Alarcón, L. F. (2016). Exploring performance of the integrated project delivery process on complex building projects. International Journal of Project Management, 34 (7), 1089–1101.
Mo, J., Yin, Y., & Gao, M. (2008). State of the art of correlation-based models of project scheduling networks. IEEE Transactions on Engineering Management, 55 (2), 349–358.
Momeni, K., & Martinsuo, M. (2019). Going downstream in a project-based firm: Integration of distributors in the delivery of complex systems. International Journal of Project Management, 37 (1), 27–42.
Muruganandan, K., Davies, A., Denicol, J., & Whyte, J. (2022). The dynamics of systems integration: Balancing stability and change on London’s crossrail project. International Journal of Project Management, 40 (6), 608–623.
Nguyen, A. T., Nguyen, L. D., Long, L. H., & Dang, C. N. (2015). Quantifying the complexity of transportation projects using the fuzzy analytic hierarchy process. International Journal of Project Management, 33 (6), 1364–1376.
Parraguez, P., Eppinger, S. D., & Maier, A. M. (2015). Information flow through stages of complex engineering design projects: A dynamic network analysis approach. IEEE Transactions on Engineering Management, 62 (4), 604–617.
Anderson, P. (1999). Perspective: Complexity theory and organization science. Organization Science, 10 (3), 216–232.
Revie, M., Bedford, T., & Walls, L. (2011). Supporting reliability decisions during defense procurement using a Bayes linear methodology. IEEE Transactions on Engineering Management, 58 (4), 662–673.
Steward, D. V. (1981). The design structure system: A method for managing the design of complex systems. IEEE Transactions on Engineering Management, 3 , 71–74.
Conejo, A. J., Arroyo, J. M., Contreras, J., & Villamor, F. A. (2002). Self-scheduling of a hydro producer in a pool-based electricity market. IEEE Transactions on Power Systems, 17 (4), 1265–1272. https://doi.org/10.1109/TPWRS.2002.804951
Hu, Y., Chan, A. P., Le, Y., & Jin, R. Z. (2015). From construction megaproject management to complex project management. Bibliographic Analysis Journal of Management in Engineering, 31 (4). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000254
Download references
Acknowledgements
This study was funded by the National Natural Science Foundation of China (Grant Nos. 71971157, and 71871164) and the Fundamental Research Funds for the Central Universities (Grant No. 2023300274).
Author information
Authors and affiliations.
School of Management and Engineering, Nanjing University, Jiangsu Province, Nanjing, China
Lifeng Zhu, Yi Hu, Yan Ning & Xiaoqi Xu
You can also search for this author in PubMed Google Scholar
Corresponding author
Correspondence to Xiaoqi Xu .
Editor information
Editors and affiliations.
Construction and Real Estate, Southeast University, Nanjing, China
Department of Management Science and Engineering, Chang'an University, Xi' an, China
Patrick X. W. Zou
Jingfeng Yuan
Emergency Management, Nanjing University, Nanjing, China
Rights and permissions
Reprints and permissions
Copyright information
© 2024 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper.
Zhu, L., Hu, Y., Ning, Y., Xu, X. (2024). Critical Review of Studies on Complex Construction Systems. In: Li, D., Zou, P.X.W., Yuan, J., Wang, Q., Peng, Y. (eds) Proceedings of the 28th International Symposium on Advancement of Construction Management and Real Estate. CRIOCM 2023. Lecture Notes in Operations Research. Springer, Singapore. https://doi.org/10.1007/978-981-97-1949-5_106
Download citation
DOI : https://doi.org/10.1007/978-981-97-1949-5_106
Published : 28 November 2024
Publisher Name : Springer, Singapore
Print ISBN : 978-981-97-1948-8
Online ISBN : 978-981-97-1949-5
eBook Packages : Business and Management Business and Management (R0)
Share this paper
Anyone you share the following link with will be able to read this content:
Sorry, a shareable link is not currently available for this article.
Provided by the Springer Nature SharedIt content-sharing initiative
- Publish with us
Policies and ethics
- Find a journal
- Track your research
IMAGES
VIDEO
COMMENTS
Four potential futures for CMR are outlined, depicted as four potential scenarios: convergence, retrenchment, disappearance and hybridization. These describe potential outcomes from the...
International Journal of Construction Management (IJCM) is a subscription-based, peer-reviewed journal that publishes quality papers aiming to advance the knowledge of construction management. The IJCM’s audience includes researchers and practitioners in construction management.
In answering these questions, 846 empirical research articles published in Construction Management and Economics (CME) from 2005-2014 were quantitatively analysed using descriptive statistics such as frequency and percentage analysis, and statistical hypothesis tests such as chi-square and t-test.
Find the latest published documents for construction management, Related hot topics, top authors, the most cited documents, and related journals
This study aims to undertake a holistic review of global construction risk management (CRM) research published between 2000 and 2021 and identify the intellectual structure and emerging themes of the CRM research.
Explore the latest full-text research PDFs, articles, conference papers, preprints and more on CONSTRUCTION ENGINEERING AND MANAGEMENT.
Civil engineering project management | Explore the latest full-text research PDFs, articles, conference papers, preprints and more on CONSTRUCTION PROJECT MANAGEMENT.
This research critically reviews challenges plaguing conventional construction management and decision-making solutions for construction management as devised by BIM. This review focuses on construction management’s four key bottom lines (i.e., schedule, cost, quality, and safety management) and how a BIM-based construction management ...
In this regard, this paper addresses the following three objectives; a) To assess recent performance research in construction management journals. b) To map patterns in the articles that concerned performance against proposed meta-analysis framework constructs.
As shown in Table 105.1, an increasing trend exists in both CCS and CPS research, especially in the construction sector. Among the 37 papers with a single sector involved, the construction sector contributed the most to CPS research with 24 papers involved, which indicates that CCS has become an important vehicle for the development of CPS theory.